Solutions For Well Completion And Stimulation Operations In Extreme Hot Areas
Solutions For Well Completion And Stimulation Operations In Extreme Hot Areas
- Categories:Solution
- Time of issue:2021-04-21 14:53:54
- Views:0
Complete Well Completion and Stimulation Equipment for Operation in Extreme Hot Areas
With experience in R&D, design, and manufacturing, SJS provides customers with complete well completion and stimulation equipment for operation in extreme hot areas.
1.Cementing Equipment
Features:Available in truck-, skid- and trailer-mounted configurations;
Local & remote automatic control;
Auto mixing ;
PCTLR-621A Cementing Trailer
2.Acidizing Pumper
Features:Available in truck-, skid- and trailer-mounted configurations;
Manifolds and valves are made of anti-corrosion materials, resistant to 35% hydrochloric acid;
With control room;
Local & remote automatic control.
PSTLR-621A Twin Pump Acidizing Trailer
3.Frac Equipment
Features:Available in truck-, skid- and trailer-mounted configurations;
With power range of 600-2500 BHP;
Technology for self-reinforcing of pump fluid end cylinder to increase the service life of fluid end by 100%;
IoT system;
Local & remote automatic control.
PGS-2500A Frac Pumper Skid
Scan the QR code to read on your phone
SJS Petroleum Drilling & Production Equipment Co., Ltd
Address: No. 101, Xihuan Road, Jinzhou District, Jingzhou City, Hubei Province, P.R. China
Tel: +86-716-8012162
Fax: +86-716-8429433
E-mail: info@sjs.ServaCorp.com

Official Public Account
Copyright© SJS Petroleum Drilling & Production Equipment Co., Ltd 鄂ICP备19035962号-1 Power by 300.cn SEO tags