Fuling shale gas integrated service
- Categories:Case
- Author:
- Origin:
- Time of issue:2021-05-13 10:51
- Views:
(Summary description)In 2015, Fuling shale gas field achieved phase I production of 5 billion m3, while the terrain area for phase II production and construction is extremely complex. The vertical depth of some wells is more than 3500 m, greatly increasing the difficulty of fracturing, higher requirements have been placed on the process, technology and equipment.
Fuling shale gas integrated service
(Summary description)In 2015, Fuling shale gas field achieved phase I production of 5 billion m3, while the terrain area for phase II production and construction is extremely complex. The vertical depth of some wells is more than 3500 m, greatly increasing the difficulty of fracturing, higher requirements have been placed on the process, technology and equipment.
- Categories:Case
- Author:
- Origin:
- Time of issue:2021-05-13 10:51
- Views:

More complex formations, with high deviation well, and the maximum well deviation exceeds 100 degrees;
Higher formation pressure;
Large-span in depth of the target formation, up to 4300 m, and the well temperature exceeds 140℃.
Composite bridge plug, with working temperature of 177℃ and working pressure of 105 MPa;
Composite bridge plug + wireline setting tool;
Composite bridge plug + hydraulic setting tool + sand jet perforator;
Coiled tubing mill string and composite bridge plug.
Scan the QR code to read on your phone
Relevant information
Online message
WRITE A MESSAGE TO US
SJS Petroleum Drilling & Production Equipment Co., Ltd
Address: No. 101, Xihuan Road, Jinzhou District, Jingzhou City, Hubei Province, P.R. China
Tel: +86-716-8012162
Fax: +86-716-8429433
E-mail: info@sjs.ServaCorp.com

Official Public Account
Copyright© SJS Petroleum Drilling & Production Equipment Co., Ltd 鄂ICP备19035962号-1 Power by 300.cn SEO tags