PCT-521A Dual-Pump Cementing Unit
|
Chassis vehicle |
Mercedes-Benz chassis, 8x6 |
|
Engine |
CAT C13 (475 hp @ 2100 rpm) |
|
Transmission box |
ALLISON 4700 |
|
Plunger pump |
TPH400 (4", 4 1/2" optional) |
|
Clear water centrifugal pump |
SERVA 4X3 (standard configuration: 1 unit) |
|
Circulating centrifugal pump |
SERVA 5X6 (standard configuration: 1 unit) |
|
Booster centrifugal pump |
SERVA 5X6 (standard configuration: 1 unit) |
|
Metering tank |
25bbl (4m³) |
|
Mixing tank |
8 bbl (1.2 m³) |
|
High-Energy Mixing System |
Automatic ACM-IV.1 |
|
Maximum discharge pressure |
103.5 MPa (15,000 psi) |
|
Maximum discharge displacement |
1.5 m³/min |
|
Net weight approximately |
32,000 kg |
|
Operating temperature |
-20℃~﹢50℃ |
Product Features
- Chassis power take-off ensures full utilization of the vehicle’s engine power.
- An optional external fuel heater is available, suitable for operation in extremely cold regions during winter.
- Dual-unit redundancy design to meet emergency requirements of the equipment;
- Dual-unit configuration meets the equipment’s requirements for high-pressure, high-displacement operations.

PCT-521A Dual-Pump Cementing Unit
SJS Ltd.
Address: No. 101, Xihuan Road, Jingzhou City, Hubei Province, China
Phone:0716-8012162
Fax: 0716-8429433
Email:info@sjs.ServaCorp.com
SJS Intelligent Control Branch
Address: No. 59, Yinbai Road, Jinghe Subdistrict, Dongxihu District, Wuhan City
Sorry,当前栏目暂无内容!
您可以查看其他栏目或返回 首页
Sorry,The current column has no content!
You can view other columns or return Home