Solution


"For more possibilities, to the ideal"
Complete Well Completion and Stimulation Equipment for Operation in Extreme Hot Areas

Complete Well Completion and Stimulation Equipment for Operation in Extreme Hot Areas

With experience in R&D, design, and manufacturing, SJS provides customers with complete well completion and stimulation equipment for operation in extreme hot areas.

 

1.Cementing Equipment

  Features:Available in truck-, skid- and trailer-mounted configurations;

       Local & remote automatic control;

       Auto mixing ;

 

PCTLR-621A高温固井拖车

PCTLR-621A Cementing Trailer

 

2.Acidizing Pumper

  Features:Available in truck-, skid- and trailer-mounted configurations;

       Manifolds and valves are made of anti-corrosion materials, resistant to 35% hydrochloric acid;

       With control room;

       Local & remote automatic control.

 

PSTLR-621A双泵酸化拖车

PSTLR-621A Twin Pump Acidizing Trailer

 

3.Frac Equipment

 Features:Available in truck-, skid- and trailer-mounted configurations;

      With power range of 600-2500 BHP;

      Technology for self-reinforcing of pump fluid end cylinder to increase the service life of fluid end by 100%;

      IoT system;

      Local & remote automatic control.

 

PGS-2500A高温压裂泵橇

PGS-2500A Frac Pumper Skid